The SAT and KSB signed the contract for the acquisition of the new pump for “La Niña”

The SAT and KSB signed the contract for the acquisition of the new pump for “La Niña”
The SAT and KSB signed the contract for the acquisition of the new pump for “La Niña”

From this, the Raft installed in El Cadillal will have an extraction of 6,000 m3/h.

The president of Sociedad Aguas del Tucumán, Marcelo Caponio and the representative of KSB Argentina SA, Silvio Arona They signed, in the Dining Room of the Government House, the contract to purchase the new pump that will allow the “La Niña” Pond, installed in El Cadillal, to extract a greater volume of water in times of drought.

After winning the tender, KSB Argentina SA must provide, assemble and commission the new pump as well as the command panel to increase the extraction of water from the La Niña Basin.”

Caponio explained that the new pump will have a maximum extraction capacity of 6,000 m3/h. Furthermore, he reported that, in the coming days and after 22 years, the Raft will undergo maintenance and adaptation so that it can support the weight of the new device.

According to the president of the SAT, with the new acquisition, and at the request of the governor Osvaldo Jaldo“we will be able to comply with the distribution of water in the homes of San Miguel de Tucumán in times of drought.”

The signing ceremony was attended by: the Planning and Infrastructure Manager, Eng. Sergio Lopezthe Legal Affairs Manager, Dr. Alejandra Firat; the Operation and Maintenance manager, Hugo Paliza; the head of operations, Ivan Buczek; the head of the El Cadillal Plant, Eng. Fernando Robledo and one of the electromechanics that the SAT has, Matías Álvarez.

 
For Latest Updates Follow us on Google News
 

-

PREV Where and when to watch the friendly match between Chile and Paraguay
NEXT Coffee production in Colombia would once again exceed 12 million bags in 2024